Structural damage and instability of a single storey utility room as a result of leaking drainage and water erosion below. Here the unstable structure was demolished and ground excavated. The new structure was constructed from intrusive ground works.
Works included pilling, drainage repairs, construction of retaining structures and single storey building as well as landscaping to make good following works.
コメント